Product Description
FLOOR FIX is a two component 100% (+/- 1%) solids epoxy seal coat for concrete floors to repair cracks and holes. It can be used either as a coating or filled with paint chips, marble chips and colored sand mixtures to provide an infinite array of color schemes or patterns.
Product Features
- Two component, 100% (+/- 1%) solids, quick setting epoxy seal coat
- Cures in temperatures as low as 50°F and high as 90°F
- Can be applied with brush, roller or serrated squeegee (see mixing & application instructions for details)
Applications
- Showrooms
- Restrooms
- Warehouses
- Kitchens
- And other areas where either a medium to high build clear product is needed that has a quick turnaround time
Directions for Use
Read the technical data sheet before use. Properly prepare the substrate. Remove all contaminants including curing compounds. Make sure the floor is dry. Store materials at normal room temperature prior to using. Apply material between 30-80°F. Product can be applied without a primer.
Note: This product has a very short pot life, working time may be as little as 10-15 minutes once mixed. Mix the part A and part B together thoroughly (be certain the mix ratio is correct). After the part A and part B are mixed, add in the aggregate. Thoroughly mix to make sure all of the aggregate is wetted out properly. Apply the mixed mortar at the recommended thickness using a hand trowel or other suitable equipment.
Shelf Life: 1 year in unopened containers
Application Temperature: 50-90°F with relative humidity below 85% for best results.
Mix Ratio: 8.75 pounds (.95 gallons) Part A to 4.30 pounds (.50 gallons) Part B (volumes approx.)
Recommended Film Thickness: 10-18 mils
Coverage Per Gallon: 90-160 square feet per gallon @ 10-18 mils
Cure Schedule:
Pot life (150 gram mass) …………. 22-32 minutes @ 70°F
Pot life (1 1/2 gallon volume)………15-25 minutes @ 70°F
Tack free (dry to touch) …………….….. 4-6 hours @ 70°F
Tack free (dry to touch) …..……….…13-17 hours @ 50°F
Recoat or topcoat ……….……………… 6-9 hours @ 70°F
Light foot traffic .………………….…… 6-12 hours @ 70°F
Full cure (heavy traffic) …………….…… 2-5 days @ 70°F
Primer: Recommended – clear
Topcoat: Optional: aliphatic urethanes or successive coats in aggregate filled systems, with or without a clear urethane topcoat.